|
|
|
RECYCLING OF CONSTRUCTION MATERIAL Mobile crush- and filter- facility „We make everything small“ The preliminary sorting of the demolition waste is done by a hydraulic unit which crushes big material beforehand. The broken material can be sorted by its fractions subsequently (for example: 0/8 , 8/16, 16/32 , 16/45, 45/x). For loading of the facility and for transport and logistic of the material, 2 wheel loaders of the 3,0 and 4,5 m³ class are used. We rent these facilities individually or as a package including wheel loaders and bucket excavator.
|
|
Cooperation |